Which statement describes pressurized piping testing in relation to monthly monitoring?

Every 60 days

Every 1 year

Annual verification of pipe tightness is what aligns with monthly monitoring. Monthly monitoring continuously checks for leaks, but to be sure the pressurized piping remains structurally sound, a formal tightness test is performed on a yearly basis. This yearly test confirms there are no leaks beyond what monthly monitoring would catch and keeps the system in compliance without imposing unnecessary testing frequency. The other intervals don’t fit typical practice: testing every couple of months or every six months would be more frequent than needed given the ongoing monthly monitoring, while testing every three years would risk undetected leaks for too long.

Every 3 years

Every 6 months